1949-07-20-sr-p17-reardan-stand-pipe-completed

From Reardan History Wiki
Revision as of 10:19, 15 August 2023 by Kirk (talk | contribs) (initial upload)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

July 20, 1949 Spokesman-Review Page 17:

1949-07-20-sr-p17-reardan-stand-pipe-completed.jpg

REARDAN WATER SYSTEM STAND PIPE COMPLETED

REARDAN, Wash., July 19.—The Pittsburgh-Des Moines Steel company of San Francisco has erected the 100,000-gallon stand pipe for the town’s water system, and completed the testing.

The paint job will begin this week. The new tank replaces the concrete reservoir a mile southwest of town.